90kW Synergy Manager SWITCH DC Switch, MC4, DC SPD

SolarEdge

90kW Synergy Manager SWITCH DC Switch, MC4, DC SPD

SE-90000-SWITCH-FULL

£4,246.00 exVAT

What's in this bundle?

2 products

Other Features

Three Phase Synergy Inverter

Main features:

  • Pre-commissioning feature for automated validation of system components and wiring during the site installation process and prior to grid connection.
  • Easy 2-person installation with lightweight, modular design (each inverter consists of 2 or 3 Synergy Units and one Synergy Manager).
  • Independent operation of each Synergy Unit enables higher uptime and easy serviceability.
  • Built-in thermal sensors detect faulty wiring ensuring enhanced protection and safety.
  • Built-in arc fault protection and optional rapid shutdown (depending on Synergy Manager used)
  • Built-in PID mitigation for maximized system performance.
  • Monitored and field-replaceable surge protection devices: integrated RS485 and Type 2 DC SPDs, optional Type 2 AC SPD.
  • Integrated DC safety switch eliminates the need for external DC isolators.

 

Please note FULL parts consist of 1x Synergy Manager and 2x Synergy Units ( 3x for 90 and 100kW)
 
Some documents are currently missing. These will be added as soon as available. 

Technical Specifications

Segen Part No SE-90000-SWITCH-FULL